M-III Engineering has cultivated partnerships with municipal and state employees and various General Contractors to help deliver projects and negotiate scopes of work between entities. M-III also has the benefit of having the President work on the "other side of the table" as a Town Engineer. This experience gives M-III a unique perspective to help Municipalities what they want while still being able to look after the client's interest. M-III's extensive experience with land surveying for municipalities and NCDOT position the company to ensure a successful project. M-III also has the benefit of being able to help satisfy our client's set-aside requirements. M-III is a certified Small Disadvantaged Business through North Carolina, Virginia, and Federal departments.

recent representative Projects

Third Fork Greenway Trail, Durham, NC consists of a 3.9 mile, 10'-wide bicycle and walking trail designed to connect and beautify existing portions of the Durham Greenway system. M-III was contracted to stake construction limits/entrances and tree protection/silt fences.  M-III provided grading stakes for the asphalt & concrete trails and staked the abutments for the 22 wooden boardwalks.  Associated stormwater utilities and signs were also staked and the required as-built drawings were surveyed and mapped per the projects specifications.Third Fork Trail, Durham, NC
Apex Peakway Extension, Apex, NC constructed as a requirement to serve the new Broadstone Mixed-Use Development.  M-III was contracted to provide the clearing limits, construction staking and as-built drawings for the project. Apex Peakway
Louisburg Sanitary Sewer Outfall is a 3+ mile sanitary sewer outfall servicing portions of Franklin County, NC.  M-III was contracted to flag the clearing limits/silt fence, stake with grades and offsets for 103 new manholes, and provide required as-built surveys for the project after construction completion.Louisburg Outfall

Background Bottom